dereckson moved T1703: Evaluate Penpot from Current focus to RC / beta / virtually adopted on the Product evaluation board.
May 6 2023, 16:01 · design, Product evaluation
dereckson moved T1610: Deploy Jitsi Meet instance from Backlog to Current focus on the Product evaluation board.
May 6 2023, 16:01 · Operations sprints (Ignite Alkane Propulsion), Wolfplex migration, XMPP, Nasqueron Docker deployment squad, Servers, Product evaluation
dereckson moved T1780: Investigate Uptime Kuma for uptime monitoring and status page from Current focus to Nope / later on the Product evaluation board.
May 6 2023, 16:00 · Product evaluation
dereckson lowered the priority of T1780: Investigate Uptime Kuma for uptime monitoring and status page from High to Low.

Let's first see what's going on with ServPulse before exploring Uptime Kuma.

May 6 2023, 16:00 · Product evaluation
dereckson moved T1610: Deploy Jitsi Meet instance from Backlog to Backlog - Docker on the Operations sprints (Ignite Alkane Propulsion) board.
May 6 2023, 15:55 · Operations sprints (Ignite Alkane Propulsion), Wolfplex migration, XMPP, Nasqueron Docker deployment squad, Servers, Product evaluation

Apr 3 2023

dereckson created T1820: Evaluate TypeSense.
Apr 3 2023, 01:31 · www.nasqueron.org, Product evaluation

Apr 2 2023

dereckson updated subscribers of T1610: Deploy Jitsi Meet instance.
Apr 2 2023, 17:55 · Operations sprints (Ignite Alkane Propulsion), Wolfplex migration, XMPP, Nasqueron Docker deployment squad, Servers, Product evaluation
dereckson added a comment to T1703: Evaluate Penpot.

Provisioned new secrets to Vault under ops/secrets/nasqueron/penpot/

Apr 2 2023, 01:36 · design, Product evaluation
dereckson claimed T1703: Evaluate Penpot.

We want to try to build a status page, so Penpot could be a nice tool for that.

Apr 2 2023, 00:28 · design, Product evaluation

Mar 31 2023

dereckson added a revision to T1812: Deploy Airflow: D2953: Use Python boolean format for Airflow configuration.
Mar 31 2023, 00:16 · Product evaluation, Continous integration and delivery, Nasqueron Databases
dereckson added a revision to T1812: Deploy Airflow: D2952: Report Airflow errors to Sentry.
Mar 31 2023, 00:09 · Product evaluation, Continous integration and delivery, Nasqueron Databases
dereckson added a revision to T1812: Deploy Airflow: D2950: Remove in-container healthchecks for Airflow.
Mar 31 2023, 00:00 · Product evaluation, Continous integration and delivery, Nasqueron Databases

Mar 30 2023

dereckson added a revision to T1812: Deploy Airflow: D2941: Create airflow PostgreSQL database.
Mar 30 2023, 23:47 · Product evaluation, Continous integration and delivery, Nasqueron Databases
dereckson added a revision to T1812: Deploy Airflow: D2943: Deploy Airflow to Dwellers.
Mar 30 2023, 23:47 · Product evaluation, Continous integration and delivery, Nasqueron Databases
dereckson triaged T1812: Deploy Airflow as Normal priority.
Mar 30 2023, 23:46 · Product evaluation, Continous integration and delivery, Nasqueron Databases

Mar 15 2023

dereckson added a comment to T1648: Interact with Gotify.

Seems more or less alive, with a commit in January.

Mar 15 2023, 20:55 · Product evaluation, Notifications center

Mar 13 2023

dereckson added a comment to T1105: Evaluate if Zammad wouldn't be useful.

Twitter support discontinuation

Mar 13 2023, 16:43 · Product evaluation, Nasqueron Docker deployment squad, Mail
dereckson updated the task description for T1105: Evaluate if Zammad wouldn't be useful.
Mar 13 2023, 16:43 · Product evaluation, Nasqueron Docker deployment squad, Mail

Mar 3 2023

dereckson added a comment to T1468: Evaluate PhotoPrism.

March 2023 check. Still in active development.

Mar 3 2023, 20:20 · Nasqueron Docker deployment squad, Product evaluation
dereckson triaged T1780: Investigate Uptime Kuma for uptime monitoring and status page as High priority.
Mar 3 2023, 20:19 · Product evaluation

Feb 16 2023

dereckson updated the task description for T1771: Evaluate Keycloak as identity and access management solution.
Feb 16 2023, 19:26 · Product evaluation, Login and identity services
dereckson triaged T1771: Evaluate Keycloak as identity and access management solution as Normal priority.
Feb 16 2023, 19:20 · Product evaluation, Login and identity services

Dec 21 2022

dereckson moved T1423: Investigate OpenFaaS + Kong from Backlog to New ideas on the Nasqueron API board.
Dec 21 2022, 19:16 · Nasqueron Docker deployment squad, Servers, Nasqueron API, Product evaluation

Dec 19 2022

inidal closed T1529: Evaluate ml-workspace and ml-hub as Wontfix.

Lost interest in the subject and it's not maintained anymore.

Dec 19 2022, 22:12 · Product evaluation, Servers
inidal removed a project from T1529: Evaluate ml-workspace and ml-hub: User-inidal.
Dec 19 2022, 21:59 · Product evaluation, Servers
dereckson shifted T1648: Interact with Gotify from the Restricted Space space to the S1 Nasqueron space.
Dec 19 2022, 21:55 · Product evaluation, Notifications center

Dec 4 2022

dereckson created T1744: Stream processing with Benthos.
Dec 4 2022, 04:19 · Message queues, Monitoring and reporting, Elastic for infra, Servers, Product evaluation

Oct 22 2022

dereckson moved T1703: Evaluate Penpot from Current focus to Nope / later on the Product evaluation board.

We need a project needing design to deploy this I guess.

Oct 22 2022, 19:28 · design, Product evaluation

Mar 19 2022

dereckson moved T1693: Evaluate Sensu for monitoring from Backlog to Checks on the Monitoring and reporting board.
Mar 19 2022, 01:37 · Servers, Monitoring and reporting, Product evaluation

Mar 15 2022

dereckson updated subscribers of T1703: Evaluate Penpot.
Mar 15 2022, 18:36 · design, Product evaluation
dereckson added a revision to T1703: Evaluate Penpot: D2597: Deploy Penpot.
Mar 15 2022, 18:36 · design, Product evaluation
dereckson triaged T1703: Evaluate Penpot as Wishlist priority.
Mar 15 2022, 18:35 · design, Product evaluation
dereckson moved T1693: Evaluate Sensu for monitoring from Backlog to Current focus on the Product evaluation board.
Mar 15 2022, 18:32 · Servers, Monitoring and reporting, Product evaluation

Mar 2 2022

dereckson added a revision to T1693: Evaluate Sensu for monitoring: D2565: Deploy Sensu on Dwellers.
Mar 2 2022, 23:54 · Servers, Monitoring and reporting, Product evaluation
dereckson updated the task description for T1693: Evaluate Sensu for monitoring.
Mar 2 2022, 23:53 · Servers, Monitoring and reporting, Product evaluation
dereckson moved T1693: Evaluate Sensu for monitoring from Backlog to In progress on the User-Dereckson board.
Mar 2 2022, 23:52 · Servers, Monitoring and reporting, Product evaluation
dereckson triaged T1693: Evaluate Sensu for monitoring as Normal priority.
Mar 2 2022, 23:52 · Servers, Monitoring and reporting, Product evaluation

Feb 20 2022

dereckson added a project to T1490: Evaluate Storybook: Product evaluation.
Feb 20 2022, 12:05 · Product evaluation, design, Operations sprints (Move the ambiant lights)

Jan 23 2022

dereckson updated the task description for T1612: Investigate OpenTelemetry.
Jan 23 2022, 03:36 · Keruald, Zed, Product evaluation
dereckson renamed T1612: Investigate OpenTelemetry from Investigate OpenTelemetry / OpenTracing to Investigate OpenTelemetry.
Jan 23 2022, 03:35 · Keruald, Zed, Product evaluation

Sep 2 2021

dereckson shifted T1648: Interact with Gotify from the S1 Nasqueron space to the Restricted Space space.
Sep 2 2021, 09:42 · Product evaluation, Notifications center
dereckson created T1648: Interact with Gotify.
Sep 2 2021, 09:41 · Product evaluation, Notifications center

Oct 11 2020

dereckson created T1636: Evaluate Screego.
Oct 11 2020, 01:37 · Nasqueron Docker deployment squad, Product evaluation

Sep 30 2020

dereckson added a subtask for T1392: Evaluate Prometheus: T1623: Deploy Prometheus to gain observability.
Sep 30 2020, 01:31 · Monitoring and reporting, Product evaluation
dereckson updated the task description for T1392: Evaluate Prometheus.
Sep 30 2020, 01:30 · Monitoring and reporting, Product evaluation
dereckson added a project to T1529: Evaluate ml-workspace and ml-hub: User-inidal.
Sep 30 2020, 01:15 · Product evaluation, Servers

Sep 29 2020

inidal added a comment to T1529: Evaluate ml-workspace and ml-hub.

Seems very interesting, I'll check that as soon as I can. ;)

Sep 29 2020, 23:56 · Product evaluation, Servers
dereckson updated subscribers of T1529: Evaluate ml-workspace and ml-hub.

@inidal Could be a nice project to start to learn modern app deployment, which matches some of your interests (Python, Jupyter).

Sep 29 2020, 23:04 · Product evaluation, Servers
dereckson updated the task description for T1632: Investigate how to represent architecture through a diagram.
Sep 29 2020, 23:03 · Product evaluation
dereckson updated the task description for T1506: Investigate how a graph could help to represent network.
Sep 29 2020, 23:03 · Servers, Product evaluation
dereckson created T1632: Investigate how to represent architecture through a diagram.
Sep 29 2020, 23:02 · Product evaluation
dereckson closed T1630: Deploy croc relay as Wontfix.

Quick discussion on IRC between @dereckson and @amj: the incentive to install a specialized client to exchange files is weak. That's especially true is BOTH parties for the exchange needs to install it.

Sep 29 2020, 22:50 · Product evaluation

Sep 24 2020

dereckson created T1630: Deploy croc relay.
Sep 24 2020, 02:10 · Product evaluation
dereckson moved T1468: Evaluate PhotoPrism from Current focus to Nope / later on the Product evaluation board.
Sep 24 2020, 02:09 · Nasqueron Docker deployment squad, Product evaluation

Mar 19 2020

dereckson created T1612: Investigate OpenTelemetry.
Mar 19 2020, 02:00 · Keruald, Zed, Product evaluation

Mar 16 2020

dereckson updated the task description for T1610: Deploy Jitsi Meet instance.
Mar 16 2020, 12:06 · Operations sprints (Ignite Alkane Propulsion), Wolfplex migration, XMPP, Nasqueron Docker deployment squad, Servers, Product evaluation
dereckson created T1610: Deploy Jitsi Meet instance.
Mar 16 2020, 12:06 · Operations sprints (Ignite Alkane Propulsion), Wolfplex migration, XMPP, Nasqueron Docker deployment squad, Servers, Product evaluation

Mar 11 2020

dereckson added a comment to T1423: Investigate OpenFaaS + Kong.

Kuma is perhaps a better approach for a service mesh.

Mar 11 2020, 23:14 · Nasqueron Docker deployment squad, Servers, Nasqueron API, Product evaluation

Feb 17 2020

dereckson added a comment to T852: Investigate matrix.nasqueron.org.

There are also 2015-09-19 files on Dwellers, for a Docker container:

Feb 17 2020, 23:52 · Product evaluation, Nasqueron Docker deployment squad, Servers
dereckson added a comment to T1105: Evaluate if Zammad wouldn't be useful.

A new version 3.2.0 has been released 2019-12-03 and contains an interesting part:

Feb 17 2020, 06:22 · Product evaluation, Nasqueron Docker deployment squad, Mail

Jan 14 2020

dereckson added a comment to T1486: Evaluate Archery.

Still maintained.

Jan 14 2020, 15:19 · security, Product evaluation, Operations sprints (Move the ambiant lights)
dereckson updated the task description for T1486: Evaluate Archery.
Jan 14 2020, 15:18 · security, Product evaluation, Operations sprints (Move the ambiant lights)
dereckson moved T1488: Evaluate Snyk from Backlog to Working on on the Operations sprints (Move the ambiant lights) board.
Jan 14 2020, 14:45 · Product evaluation, Operations sprints (Move the ambiant lights)
dereckson added a comment to T1488: Evaluate Snyk.

I've created the snyk user on phab and allowed commits to bypass review on phab first.

Jan 14 2020, 14:44 · Product evaluation, Operations sprints (Move the ambiant lights)
dereckson triaged T1489: Write a microservice with nameko as Low priority.

Project activity decreased.

Jan 14 2020, 14:43 · Product evaluation, Operations sprints (Move the ambiant lights)

Dec 16 2019

dereckson moved T1105: Evaluate if Zammad wouldn't be useful from Nope / later to Backlog on the Product evaluation board.
Dec 16 2019, 09:41 · Product evaluation, Nasqueron Docker deployment squad, Mail
dereckson reopened T1105: Evaluate if Zammad wouldn't be useful as "Open".

we're at the +18 months moment and Zammad is still in active development, with a new release this December.

Dec 16 2019, 09:41 · Product evaluation, Nasqueron Docker deployment squad, Mail
dereckson added a comment to T1468: Evaluate PhotoPrism.

Back this December in active development. Previous active dev period was this summer.

Dec 16 2019, 09:37 · Nasqueron Docker deployment squad, Product evaluation

Oct 7 2019

dereckson renamed T1529: Evaluate ml-workspace and ml-hub from Evaluate ml-workspac and ml-hub to Evaluate ml-workspace and ml-hub.
Oct 7 2019, 01:07 · Product evaluation, Servers

Sep 25 2019

dereckson created T1529: Evaluate ml-workspace and ml-hub.
Sep 25 2019, 10:40 · Product evaluation, Servers

Jan 29 2019

dereckson created T1506: Investigate how a graph could help to represent network.
Jan 29 2019, 09:58 · Servers, Product evaluation

Nov 27 2018

dereckson added a project to T1489: Write a microservice with nameko: Product evaluation.
Nov 27 2018, 22:53 · Product evaluation, Operations sprints (Move the ambiant lights)
dereckson added a comment to T1488: Evaluate Snyk.

One of the problem is the lack of integration with Phabricator.

Nov 27 2018, 22:04 · Product evaluation, Operations sprints (Move the ambiant lights)
dereckson created T1488: Evaluate Snyk.
Nov 27 2018, 21:57 · Product evaluation, Operations sprints (Move the ambiant lights)
dereckson created T1486: Evaluate Archery.
Nov 27 2018, 21:17 · security, Product evaluation, Operations sprints (Move the ambiant lights)

Oct 30 2018

dereckson closed T405: Test Flockport mail server as Wontfix.

Not maintained anymore at Flockport level. At this stage, we can use as a base template to provision a standalone mail server ourself through Salt.

Oct 30 2018, 18:56 · Product evaluation, User-Sandlayth, Mail
dereckson moved T405: Test Flockport mail server from RC / beta / virtually adopted to Nope / later on the Product evaluation board.
Oct 30 2018, 17:43 · Product evaluation, User-Sandlayth, Mail
dereckson moved T852: Investigate matrix.nasqueron.org from Backlog to Nope / later on the Product evaluation board.
Oct 30 2018, 17:43 · Product evaluation, Nasqueron Docker deployment squad, Servers
dereckson moved T645: Redeploy Shipyard on Dwellers from Backlog to Nope / later on the Product evaluation board.
Oct 30 2018, 17:43 · Product evaluation, Servers, Nasqueron Docker deployment squad

Oct 15 2018

dereckson renamed T1468: Evaluate PhotoPrism from Evaluate Photoprism to Evaluate PhotoPrism.
Oct 15 2018, 18:51 · Nasqueron Docker deployment squad, Product evaluation
dereckson added projects to T1468: Evaluate PhotoPrism: discussion, Nasqueron Docker deployment squad.
Oct 15 2018, 18:50 · Nasqueron Docker deployment squad, Product evaluation
dereckson created T1468: Evaluate PhotoPrism.
Oct 15 2018, 18:48 · Nasqueron Docker deployment squad, Product evaluation

Sep 23 2018

dereckson updated subscribers of T852: Investigate matrix.nasqueron.org.

@amj is actually interested by Matrix and have used client part on Eglide.

Sep 23 2018, 12:43 · Product evaluation, Nasqueron Docker deployment squad, Servers

Sep 11 2018

dereckson added projects to T1423: Investigate OpenFaaS + Kong: Product evaluation, Nasqueron API, Servers, Nasqueron Docker deployment squad.
Sep 11 2018, 13:43 · Nasqueron Docker deployment squad, Servers, Nasqueron API, Product evaluation

Apr 15 2018

dereckson updated the task description for T1392: Evaluate Prometheus.
Apr 15 2018, 03:58 · Monitoring and reporting, Product evaluation
dereckson created T1392: Evaluate Prometheus.
Apr 15 2018, 03:57 · Monitoring and reporting, Product evaluation

Mar 23 2018

dereckson closed T645: Redeploy Shipyard on Dwellers as Wontfix.

The author retired the project and recommend instead Rancher, Docker UI or Portainer.

Mar 23 2018, 01:08 · Product evaluation, Servers, Nasqueron Docker deployment squad
dereckson closed T644: Setup an etcd K/V store, a subtask of T645: Redeploy Shipyard on Dwellers, as Wontfix.
Mar 23 2018, 01:07 · Product evaluation, Servers, Nasqueron Docker deployment squad

Oct 20 2017

dereckson reopened T644: Setup an etcd K/V store, a subtask of T645: Redeploy Shipyard on Dwellers, as Open.
Oct 20 2017, 10:53 · Product evaluation, Servers, Nasqueron Docker deployment squad

Oct 15 2017

dereckson closed T852: Investigate matrix.nasqueron.org as Resolved.

Not interest among Nasqueron dwellers those last two years.

Oct 15 2017, 12:09 · Product evaluation, Nasqueron Docker deployment squad, Servers
dereckson added a comment to T852: Investigate matrix.nasqueron.org.

DNS entry should be removed per T536 close as WONTFIX.

Oct 15 2017, 12:05 · Product evaluation, Nasqueron Docker deployment squad, Servers

Mar 3 2017

dereckson edited Description on Product evaluation.
Mar 3 2017, 00:43

Jan 16 2017

dereckson added a project to T852: Investigate matrix.nasqueron.org: Product evaluation.
Jan 16 2017, 08:53 · Product evaluation, Nasqueron Docker deployment squad, Servers

Jan 15 2017

dereckson added a project to T645: Redeploy Shipyard on Dwellers: Product evaluation.
Jan 15 2017, 07:30 · Product evaluation, Servers, Nasqueron Docker deployment squad
dereckson moved T405: Test Flockport mail server from Backlog to RC / beta / virtually adopted on the Product evaluation board.
Jan 15 2017, 07:26 · Product evaluation, User-Sandlayth, Mail
dereckson moved T332: Evaluate Rundeck at deck.nasqueron.org from Backlog to Nope / later on the Product evaluation board.
Jan 15 2017, 07:25 · Product evaluation, Nasqueron Docker deployment squad
dereckson added a project to T332: Evaluate Rundeck at deck.nasqueron.org: Product evaluation.
Jan 15 2017, 07:24 · Product evaluation, Nasqueron Docker deployment squad
dereckson added a project to T405: Test Flockport mail server: Product evaluation.
Jan 15 2017, 07:23 · Product evaluation, User-Sandlayth, Mail
dereckson moved T1105: Evaluate if Zammad wouldn't be useful from Backlog to Nope / later on the Product evaluation board.
Jan 15 2017, 07:23 · Product evaluation, Nasqueron Docker deployment squad, Mail
dereckson added a project to T1105: Evaluate if Zammad wouldn't be useful: Product evaluation.
Jan 15 2017, 07:23 · Product evaluation, Nasqueron Docker deployment squad, Mail